Requirements Management Without Information Gaps

Business, development and test clarify requirements together, right from the concept phase. The result: stories that can be estimated, built and tested, traceable through to release in Jira and Xray.

Discuss your project →Go to Test Management

THE WAY IN FOUR PHASES

From requirement to released story

Each phase ends with a clear result. Only when it is in place does the next one begin. Business, development and test work through all four phases together.

  1. Phase 1

    Slice

    Business, development and test slice stories out of the process together.

    Result: Story drafts on the story card, roughly checked with INVEST.

    Move on when every capability is assigned and no draft obviously violates INVEST.

    To the phase →

  2. Phase 2

    Clarify

    Example Mapping: one session per story, 25 minutes at most.

    Result: A map with rules, examples and open questions.

    Move on when everyone shows a thumb. Otherwise split or clarify.

    To the phase →

  3. Phase 3

    Describe

    Developer and tester write the BDD story, the business unit gives feedback.

    Result: Scenarios that are at the same time the test cases.

    Move on when the business unit confirms and the red questions are answered.

    To the phase →

  4. Phase 4

    Prove

    Test cases, execution and results in Jira and Xray.

    Result: Test coverage per story and epic.

    Move on when passed tests turn the story green. Then the release follows.

    To the phase →

PHASE 1 · SLICE · THE PRINCIPLE

Three perspectives, together from the start

Typically a business analyst writes the requirement, development implements it, and testing follows. Every handover loses information. We bring all three roles into the concept phase so that no gaps appear later in the information chain.

Usual: the relay race

  1. Business analyst
  2. Development
  3. Test

Every handover loses information. Gaps only surface during implementation or testing, when corrections are expensive.

Our approach: together in the concept phase

  1. Business
  2. Development
  3. Test

All three clarify the same requirement at the same time. Questions and gaps are closed before anything is built.

BADEVTESTSharedunderstandingof the requirement

Business and business analyst

Clarifies value and business logic: What should the requirement achieve, for whom and with what result?

Development

Checks feasibility, dependencies and effort: What is technically required, and where are the risks?

Test

Checks testability and writes acceptance criteria: How will we know the requirement is met?

Three slicing rules follow from this

Vertical, not by layer

Every story delivers something verifiable. Front end, back end and test belong together.

Minimal slice first

One flow runs through the whole system before anything is expanded.

Boundaries are mandatory

What a story includes, and what it deliberately excludes, is stated in the story itself.

PHASE 1 · SLICE · APPROACH

From process view to estimable story

Six steps that business, development and test take together, whether for a business application, a portal or an SAP extension.

  1. 1

    Structure the process together

    The flow is broken into a few activities, for example search, capture, pay, confirm. They give orientation but are not story boundaries.

  2. 2

    Collect capabilities

    Each activity consists of business capabilities, the smallest building blocks. For each one we note what it does not cover and where the requirement comes from.

  3. 3

    Set the sequence

    First the minimal slice, then expansion stages by value, risk and dependencies.

  4. 4

    Slice stories together

    Capabilities are bundled or split until a package meets the INVEST criteria. All three roles review. As many activities as necessary, as few as possible. Result: story drafts, roughly checked with INVEST. How it works: Example Mapping →

  5. 5

    Describe stories

    Every story follows the same template: scope, boundaries, prerequisites, dependencies and acceptance criteria. To the story template →

  6. 6

    Check coverage

    Every capability is assigned, multiple assignments are justified, dependencies and open questions are visible.

PHASE 1 · SLICE · STORY MAP

The whole scope at a glance

The columns show the activities of the process, the rows show the order of implementation. The example is fictional and shows an online order.

A0Search
A1Cart
A2Delivery
A3Payment
A4Confirmation
A5Order view
Minimal sliceWalking skeleton
S1Search products by name
S1Add item to cart
S2Enter delivery address
S3Pay by invoice
S3Show confirmation
S4Retrieve order by number
Priority 1Expansion stage
S5Filter and sorting
S6Change quantity
DMultiple delivery addresses
S7Pay by credit card
DConfirmation by email
–
Priority 2Expansion stage
–
DRedeem voucher
DChoose shipping option
–
–
DOrder history
Priority 3later
Wish list
–
–
Partial payment
Invoice as PDF
Cancellation
S1planned in story 1Dstory draftnot yet assigned

A story may link several activities: S1 and S3 each span two columns. What counts is the verifiable value, not the column.

PHASE 1 · SLICE · STORY SLICING

Where a story ends

A story is sliced when the package of capabilities meets the INVEST criteria sufficiently and detailed design, implementation and test can be planned and estimated together. Each question has a role that can judge it best.

Belongs in the same story

  • Plausibility checks and validations of the function
  • Error handling
  • Required authorisation checks
  • Technical work that affects only this story, as a task

Managed on its own

  • Technical prerequisites for several stories, with a verifiable result
  • Deliberately excluded scope, stated as "not included" in the story
  • Dependencies on later areas, made visible and pulled forward if needed

INVEST check

INVEST check questions with lead role
CriterionCheck questionLead role
IndependentCan the package be implemented and tested largely independently? Are unavoidable dependencies named?DevelopmentBusiness
NegotiableIs the required function described without prescribing the technical solution unnecessarily?BusinessDevelopment
ValuableDoes the package deliver business value or visible process progress?Business
EstimableAre scope, technical impact and test effort known well enough to estimate?Development
SmallDo detailed design, implementation and test together fit into the size range of four to eight weeks?All three
TestableCan the scope be verified independently using a concrete acceptance example?Test

Guideline for size: detailed design, implementation and test together fit into four to eight weeks, depending on the team. For sprint planning the story is then broken into tasks.

PHASE 1 · SLICE · STORY TEMPLATE

One story, one card: every requirement comparable at a glance

A fixed template makes stories estimable and plannable. Every field earns its place.

STORY S3 · EXAMPLEPay by invoice
draft
Title
Pay order by invoice
Role and benefit
As a customer I want to pay my order by invoice so that I only pay after delivery.
Capabilities
Pay by invoice · Show confirmation
Included
Credit check (plausibility) · Confirmation page · Test via order number
Not included
Credit card · Confirmation by email
Technical prerequisite
Task T2: Test access to the payment service
Dependency
S2 Enter delivery address
Acceptance criteria
Given a valid order, when the customer selects "Invoice", then the confirmation with order number is shown.
INVEST
INVEST

The draft is complete when

  • business, development and test have reviewed the story together
  • all six INVEST questions are answered
  • acceptance criteria are written
  • dependencies and open questions are named
  • technical prerequisites are assigned

What the fields are for

  • "Not included" keeps the scope stable
  • Acceptance criteria become test cases
  • Prerequisites and dependencies make the sequence plannable
PHASE 2 · CLARIFY · EXAMPLE MAPPING

Clarify every story in 25 minutes: Example Mapping

Slicing produces a draft. In Example Mapping, business, development and test clarify each story together: where does it end, which rules apply, which cases are there, what is still open? That is how requirements are sliced into bite-sized pieces, estimated reliably and described efficiently, and every rule has its examples.

The method was described by Matt Wynne from the Cucumber community. Four card colours make the result readable at a glance:

StoryAs a customer I want to redeem a voucher in my basket so that I save money.
RuleThe voucher must be valid
ExampleCode valid until 31 Dec, today is 15 Dec: discount is deducted
ExampleCode expired: notice, no discount
ExampleCode does not exist: error message
RuleOne voucher per order
ExampleSecond code is entered: notice, the first stays active
RuleFrom 50 euros order value
ExampleOrder value 49.99 euros: no discount
ExampleOrder value 50.00 euros: discount is deducted

Open questions

QuestionDoes the discount also apply to shipping costs?
QuestionWhat happens to the discount when the goods are returned?
StoryRule (acceptance criterion)ExampleQuestion

The example is fictitious and shows an online order.

INVEST checks, Example Mapping clarifies

INVEST is the checklist: how do we recognise that a story is sliced well? Example Mapping is the method with which the team clarifies the story and meets these criteria. The map shows directly where something is still missing.

What the Example Mapping cards show about the INVEST criteria
CriterionWhat the map shows
IndependentRed cards reveal dependencies on other stories and systems.
NegotiableThe map records rules and examples, not the solution. Gherkin follows only afterwards.
ValuableThe yellow card (“so that I …”) requires the business unit to name the value.
EstimableFew rules and no open questions: the story can be estimated.
SmallMany blue cards: the story is too big and gets split.
TestableGreen examples already are the concrete check of every rule.
PHASE 2 · CLARIFY · THE SESSION

Short, time-boxed, with a clear outcome

One story, 25 minutes

Business unit or product owner, development and test, five people at most. One story per session. Open questions go on a red card.

No Gherkin yet

The formalism would distract from the content. Developer and tester write the BDD story afterwards.

Unanimous and uncomplicated

At the end everyone shows a thumb: is the story ready? Then the discussion stops.

Three possible outcomes

Ready

Few rules, no open questions

The examples cover the rules, everyone agrees. The story goes into the sprint backlog.

Split

Many rules

The story is too big. Rules are bundled into new stories, each estimable and testable on its own.

Clarify

Many open questions

The story is not mature yet. The questions are answered, then a second session follows.

PHASE 3 · DESCRIBE · BDD STORY

After the session: the BDD story

A developer and a tester write the BDD story from the map, and the business unit gives feedback. Every example becomes a scenario. The scenarios are at the same time the test cases and the basis for the entry gateway before UAT.

  • Yellow storybecomes the feature: title and the story sentence “As a … I want …”.
  • Blue rulebecomes a rule, under which the matching scenarios sit.
  • Green examplesbecome scenarios. Examples with different values become rows of an examples table.
  • Red questionstays open. It is clarified first, then the scenario is written.
Feature: Redeem voucher
  As a customer I want to redeem a voucher in my basket
  so that I save money.

  Rule: The voucher must be valid

    Scenario: Expired voucher
      Given the voucher has expired
      When I redeem it in the basket
      Then I see a notice
      And no discount is deducted

  Rule: From 50 euros order value

    Scenario Outline: Minimum order value
      Given the order value is <value> euros
      When I redeem a valid voucher
      Then the result is "<result>"

      Examples:
        | value | result                |
        | 49.99 | no discount           |
        | 50.00 | discount is deducted  |

  # Open from the map: Does the discount also apply to shipping costs?

Given, When, Then

Context, action, outcome: the pattern of arrange, act and assert. A scenario without action and check is not a test.

One behaviour per scenario

A scenario describes exactly one behaviour and has a meaningful title. That keeps it readable and checkable on its own.

The language of the business

The scenario describes behaviour, not clicks and field names. The business unit must be able to read and check it.

How scenarios become test cases in Xray and how the release comes about is shown in Phase 4: Prove →

More: Solution 01: Traceability with Jira and Xray → Test tools compared → Run scenarios automatically: test automation →

Process, example and cards to print are available as a guide (PDF, 12 pages, with a checklist of tasks for each role). Download the guide with card template → All downloads →

We moderate the first sessions in your team, coach moderators and review your backlog for stories that are too big or unclear. Discuss your project →

PHASE 4 · PROVE · JIRA AND XRAY

End to end in Jira and Xray

The approach does not end at the story. Acceptance criteria, test cases and, in the end, the evidence for release arise from it.

  1. 1

    Epic

    Bundles related stories (1:N), for example per activity. A separate issue type in Jira.

  2. 2

    Story

    Each story draft becomes a story. Technical prerequisites become tasks and block the story.

  3. 3

    Acceptance criteria

    Derived from the story's scope and examples, written as Given-When-Then.

  4. 4

    Test cases in Xray

    Test cases per criterion: manual with test steps or as a template for automation. The story is the test object.

  5. 5

    Execution and result

    Runs in Xray, results documented, including imports from automated pipelines.

  6. 6

    Release

    Passed tests turn the story green, the epic shows the coverage. Project-level release and go-live follow.

  • One epic bundles many stories, each story has many test cases
  • Test status flows from Xray to the requirement automatically
  • At project level the status per epic is visible without reconciling spreadsheets

More on test management →

EPICComplete order
  • S2Enter delivery addressPassed
  • S3Pay by invoicePassed
  • S4Retrieve order by numberPassed
  • S6Change quantityIn test
Test coverage3 of 4 stories passed

Illustration with sample data

RESULT

What you get from it

Estimable and plannable

Stories are bounded and described. Effort and sequence become reliable.

Testable early

Acceptance criteria exist before development starts. Test cases are created in parallel.

Traceable through to release

From the requirement through the test to the status in Jira, in one continuous chain.

FAQ

Requirements management: questions and answers

What is a BDD story?

A BDD story describes the behaviour of a user story in scenarios made of Given, When and Then. The business unit can read it, and every scenario doubles as a test case.

How does an Example Mapping session work and who takes part?

Business unit or product owner, development and test are always there, five people at most. One story is discussed, 25 minutes at most. Open questions go on red cards, and at the end everyone shows a thumb to say whether the story is ready.

Do we need Gherkin already in the session?

No. The formalism can distract from the content. A developer and a tester write the BDD scenarios afterwards, and the business unit gives feedback.

Why should development and test join in the concept phase?

Because that is where it is decided what gets built. Development spots effort and dependencies early, and test checks whether the requirement can be verified unambiguously. Gaps that would otherwise surface in implementation or testing are closed before the first line of code.

What is the difference between an epic and a user story?

An epic bundles several related stories (1:N) and represents larger themes. A story is a scope that can be estimated and tested on its own. In Jira both are separate issue types.

How big should a user story be?

Small enough that detailed design, implementation and test can be planned together. As a guideline we use four to eight weeks, depending on the team. For sprint planning the story is then broken into tasks.

What does INVEST mean?

INVEST stands for Independent, Negotiable, Valuable, Estimable, Small and Testable. With these six check questions we decide whether a story draft is sliced properly.

How do acceptance criteria become test cases in Xray?

Each acceptance criterion becomes one or more test cases, manual with test steps or as a template for automation. They are linked to the story, whose status results from the test outcomes.